According to Shandong hall of province irrigation works introduces, according to the program, shandong province plan finishs reservoir of risk of 3864 small-sized disease basically to divide danger consolidate processing with 3 years of time, shandong province is opposite the key this year danger reservoir carries out 1245 small-sized disease except danger consolidate, at present already 884 finished initial design, start working builds 126, finish 2.
According to Shandong Sun Xianli of vice director of office of headquarters of fight a drought of province flood prevention introduces, in last few years, shandong province is large and medium-sized ability of reservoir prevent or control flood had very big rise, but small-sized reservoir still is put in affection of very big risk, it is the serious trouble or danger that Shandong province flood prevention works. This year advocate before flood season, shandong saves what must finish library of the top of head of 800 small-sized keys to divide danger consolidate task, ensure degree of high water is safe.